Barkley Road
Northern Cape
Civil Services

The Barkley Road project in the Northern Cape includes the construction of internal gravel roads of varying widths, tailored to a 2-3% cross-fall and fortified with a 150mm wearing course. In addition, we’re implementing storm water channels to bolster the area’s drainage capabilities.
A water reticulation network, consisting of 75mm to 200mm diameter Class 9 pipes, is being established. These installations are coupled with house connections, water meters, fire hydrants, and isolation valves, all tailored to effective water supply and safety. For wastewater management, the focus of construction are 160mm and 200mm diameter uPVC class 34 solid wall or class 400 structured wall sewer pipes. Furthermore, we’re integrating the system with 110mm diameter Erf connections and enhancing functionality through the construction of precast concrete manholes, all fitted with heavy-duty concrete covers. This comprehensive approach affirms our commitment to achieving optimal results and meeting the highest standards in professional, technical development. The project, consisting of 1481 stands, is scheduled for completion in 2026.



GET IN TOUCH
Gap Infrastructure Corporation seeks to do so much more than redefine landscapes and deliver outstanding results – we endeavour to empower communities and change lives for generations to come. For infrastructure development services and solutions designed to fit, we invite you to contact us today.